Data Centre Roof Access Platforms – Fast-Tracked Fabrication to Meet Critical Deadlines

CASE STUDY

Data Centre Roof Access Platforms – Fast-Tracked Fabrication to Meet Critical Deadlines

Faced with a fast-approaching deadline and let down by a previous supplier, a client working on a high-value London data centre turned to Elemy for a dependable solution. The requirement was clear: fabricate and deliver GRP roof access platforms quickly without sacrificing quality or compliance.

Time was of the essence. Elemy’s design team sprang into action, producing engineered drawings and fabrication plans at speed. The structures, built entirely from GRP, offered the lightness necessary for rooftop installation without requiring mechanical lifting equipment. GRP’s corrosion resistance and minimal maintenance profile made it perfect for the exposed environment atop a data centre.

Despite the urgency, Elemy maintained its usual high standards of workmanship and documentation.

The platforms were delivered on time, allowing the main contractor to meet their site programme. This project showcased Elemy’s ability to respond quickly and decisively under pressure, turning a potential crisis into a client success story

Share: